OSHA 29 CFR 1910.179
Overhead & Gantry Crane Safety: Inspect, Operate, Lift
OSHA 1910.179 requirements for overhead and gantry cranes: crane types and parts, rated load markings, designated operators, frequent and periodic inspections, start-of-shift limit switch tests, maintenance lockout, and safe load handling.
6 minutes8 scenes10-question quiz

What's covered
- 1.Overhead and Gantry Cranes: What the Rule Covers
- 2.Know Your Crane: Parts and Markings
- 3.Designated Operators Only
- 4.Inspections: Frequent and Periodic
- 5.Start of Shift and Maintenance Lockout
- 6.Planning and Starting the Lift
- 7.Moving and Landing the Load
- 8.Recap and Your Responsibilities
Key takeaways
- 1910.179 covers overhead, gantry, semigantry, wall, and storage bridge cranes.
- Rated load is marked on each side of the crane; never exceed it.
- Only designated personnel operate cranes.
- Frequent inspections run daily to monthly; periodic inspections one to twelve months.
- Test the upper limit switch under no load at the start of every shift.
- Lock out the main switch and post signs before maintenance.
- Center the hook and test lift a few inches before moving.
- Avoid carrying loads over people and keep the travel path clear.
- Keep at least two full wraps of rope on the drum.
- This module is awareness training, not compliance or operator designation.