29 CFR 1910.331–335, 1910.137, 1910.147; 29 CFR 1926 Subpart K, 1926.1407–1411; NFPA 70E (2027); NFPA 70 (2026) (110.16, 240.87, 690, 705); NFPA 70B (2026); IEEE 1584-2018; ASTM D120-2022, ASTM F1506-2025, ASTM F1959-2024
NFPA 70E Electrical Safety Awareness (Qualified-Worker Level)
Long-form (about 4 hours) NFPA 70E instruction in five parts: core requirements; electrical hazards, OSHA/NFPA structure, and the electrical safety program; the electrically safe work condition and shock protection; arc flash risk assessment, PPE, and energized work permits; and special equipment, emergency response, medium-voltage systems and advanced arc flash studies, and 40 detailed field scenarios. Knowledge supplement only — this course alone does not qualify any worker; employers must still provide hands-on, task- and equipment-specific training and evaluation.

What's covered
- 1.NFPA 70E for Qualified Electrical Workers
- 2.Employer and Employee Responsibilities
- 3.Electrically Safe Work Condition
- 4.Testing for Absence of Voltage
- 5.When Energized Work Is Justified
- 6.Shock Risk Assessment and Approach Boundaries
- 7.Arc Flash Risk Assessment
- 8.Equipment Labeling
- 9.Arc-Rated PPE and Categories
- 10.Rubber Insulating Equipment and Tools
- 11.Job Planning and Briefings
- 12.Emergency Response and Electrical Injuries
- 13.Common Tasks: Applying the Requirements
- 14.Auditing and Continuous Improvement
- 15.Part 2: Why Electrical Safety Programs Exist
- 16.The Three Electrical Hazards: Shock, Arc Flash, Arc Blast
- 17.How Electric Current Affects the Body
- 18.OSHA General Industry: Subpart S Structure
- 19.Construction: 29 CFR 1926 Subpart K
- 20.How NFPA 70E Is Organized
- 21.Key Definitions, Part 1
- 22.Key Definitions, Part 2
- 23.Qualified Versus Unqualified Duties
- 24.Electrical Safety Program Elements in Depth
- 25.Applying the Hierarchy of Risk Control
- 26.Human Performance and Error Precursors
- 27.Job Safety Planning in Practice
- 28.Conducting an Effective Job Briefing
- 29.Host and Contract Employer Responsibilities
- 30.Training Content and Documentation
- 31.Equipment Condition and Maintenance
- 32.Lockout Program Requirements
- 33.Simple Versus Complex Lockout
- 34.Shift Change, Lock Removal, and Reenergizing
- 35.Part 3: Identifying All Sources of Supply
- 36.Opening Disconnects and Visual Verification
- 37.Selecting and Inspecting Test Instruments
- 38.Performing the Absence-of-Voltage Test
- 39.Stored Energy, Capacitors, and Induced Voltage
- 40.Temporary Protective Grounding
- 41.Shock Boundaries: Reading the AC Table
- 42.Shock Boundaries for DC Systems
- 43.Overhead Lines and Unqualified Persons
- 44.Rubber Insulating Gloves: Classes and Selection
- 45.Glove Inspection, Air Testing, and Care
- 46.Leather Protectors, Sleeves, and Blankets
- 47.Insulated and Insulating Tools
- 48.Ladders, Jewelry, and Conductive Materials
- 49.Portable Equipment and Cords: 1910.334
- 50.GFCI Protection and Assured Grounding
- 51.Wet Locations and Conductive Work Spaces
- 52.Overcurrent Devices and Resetting Rules
- 53.Safe Use of Test Equipment During Troubleshooting
- 54.Lockout Verification Errors and Lessons
- 55.Part 4: How an Arc Flash Starts and Grows
- 56.Incident Energy Analysis and IEEE 1584
- 57.Clearing Time and Protective Device Maintenance
- 58.Working Distance and Body Position
- 59.Calculating and Using the Arc Flash Boundary
- 60.PPE Category Method: Table 130.7(C)(15)(a)
- 61.PPE Category Method for DC: Table 130.7(C)(15)(b)
- 62.Interpreting Arc Flash Labels
- 63.Missing, Damaged, or Questionable Labels
- 64.Arc-Rated Clothing: ATPV, EBT, and Labels
- 65.Layering and Coverage
- 66.Head, Face, Eye, and Hearing Protection
- 67.Hand and Foot Protection
- 68.PPE Care, Laundering, and Retirement
- 69.Arc Flash Suits and Heat Stress
- 70.Reducing Incident Energy with Engineering
- 71.Walking Through an Energized Work Permit
- 72.Task-Based Risk: Table 130.5(C)
- 73.Racking Breakers and MCC Buckets
- 74.When Energized Work Is Not Appropriate
- 75.Part 4B: Introduction to Medium-Voltage Systems
- 76.Medium-Voltage Shock Boundaries and Flashover
- 77.Medium-Voltage PPE and Insulating Equipment
- 78.Switching Procedures and Switching Orders
- 79.Medium-Voltage Voltage Detection
- 80.Grounding Medium-Voltage Equipment
- 81.Transformers and Substations
- 82.Cables, Terminations, and Splices
- 83.Arc Flash Study Walkthrough: A 480-Volt Example
- 84.Why Lower Fault Current Can Mean Higher Energy
- 85.Motor Contribution and Multiple Sources
- 86.Collecting Data for an Arc Flash Study
- 87.Coordination, Selectivity, and Arc Flash
- 88.Using Maintenance Mode Correctly
- 89.Ground-Fault Protection of Equipment
- 90.Equipment Approval and Listing
- 91.Notable Changes in the 2024 Edition
- 92.Arc Blast Pressure and Projectiles
- 93.Insulation Resistance and High-Potential Testing
- 94.Management of Change for Electrical Systems
- 95.Part 5: Batteries and Battery Rooms (Article 320)
- 96.Photovoltaic and Energy Storage Systems
- 97.Variable Frequency Drives and Power Electronics
- 98.Generators, Temporary Power, and Transfer Switches
- 99.Research Labs, Test Areas, and Lasers
- 100.Emergency Response to Electrical Incidents
- 101.Investigating Electrical Incidents and Near Misses
- 102.Scenario 1: MCC Bucket Replacement
- 103.Scenario 2: Troubleshooting a 480-Volt Control Panel
- 104.Scenario 3: The Missing Label
- 105.Scenario 4: Contractor Arrives Without Site Information
- 106.Scenario 5: Shift Change During a Complex Lockout
- 107.Scenario 6: The Tester Fails the Second Check
- 108.Scenario 7: Gloves Past Their Test Date
- 109.Scenario 8: The Apprentice and the Boundary
- 110.Scenario 9: Crane Near Overhead Lines
- 111.Scenario 10: UPS Battery Maintenance
- 112.Scenario 11: VFD Repair After Power Loss
- 113.Scenario 12: Wet Location Extension Cord
- 114.Scenario 13: Justification Challenged
- 115.Scenario 14: The Production Pressure Call
- 116.Scenario 15: Unexpected Voltage After Lockout
- 117.Scenario 16: The Abandoned Lock
- 118.Scenario 17: Arc Flash Boundary in a Busy Corridor
- 119.Scenario 18: Coworker Shocked in a Mechanical Room
- 120.Part 6 Scenario 19: Infrared Windows and Thermography
- 121.Scenario 20: Replacing a 277-Volt Lighting Ballast
- 122.Scenario 21: Office Receptacle Replacement
- 123.Scenario 22: Rooftop HVAC Disconnect
- 124.Scenario 23: EV Charger Installation and Service
- 125.Scenario 24: Welding Receptacle and Cord
- 126.Scenario 25: 120-Volt Control Circuit Troubleshooting
- 127.Scenario 26: The Wrong Panel Schedule
- 128.Scenario 27: Double-Ended Substation Tie
- 129.Scenario 28: Automatic Transfer Switch Maintenance
- 130.Scenario 29: Transformer Tap Change
- 131.Scenario 30: Fuse Replacement in a Fused Disconnect
- 132.Scenario 31: Flooded Basement Electrical Room
- 133.Scenario 32: Rodent Evidence in Switchgear
- 134.Scenario 33: Smoke From an MCC
- 135.Scenario 34: Storm Outage Restoration
- 136.Scenario 35: New Hire Qualification Path
- 137.Scenario 36: Contractor Medium-Voltage Terminations
- 138.Scenario 37: Rooftop PV Combiner Box
- 139.Scenario 38: Data Center PDU Maintenance
- 140.Scenario 39: Interlock Defeat Request
- 141.Scenario 40: Audit Findings
- 142.Part 7: Learning From Case Studies
- 143.Case Study 1: The Familiar Panel
- 144.Case Study 2: The Second Source
- 145.Case Study 3: The Main Switchboard Line Side
- 146.Case Study 4: The Meter in the Wrong Mode
- 147.Case Study 5: Shift Change Gap
- 148.Case Study 6: Ladder and Overhead Busway
- 149.Case Study 7: The Second Victim
- 150.Case Study 8: What Went Right
- 151.Guided Review: Building a Job Plan From Scratch
- 152.Guided Review: Choosing PPE From a Label
- 153.Guided Review: Absence-of-Voltage Test Sequence
- 154.Guided Review: Is Energized Work Justified?
- 155.Guided Review: Simple or Complex Lockout?
- 156.Guided Review: PPE Inspection Walk-Around
- 157.Guided Review: Boundaries and People Around You
- 158.Guided Review: Recognizing Impending Failure
- 159.Guided Review: Emergency Plan Before You Start
- 160.Guided Review: Communicating With Operations
- 161.Guided Review: Culture and Stop-Work Authority
- 162.Course Review: Program and Responsibilities
- 163.Course Review: Electrically Safe Work Condition
- 164.Course Review: Energized Work, Shock, and Arc Flash
- 165.Part 8: Hazardous (Classified) Locations
- 166.Electric Utility-Type Work and 1910.269
- 167.Electrical Work in Confined and Enclosed Spaces
- 168.Temporary Wiring and Power Distribution
- 169.Running a Cord-and-Plug Equipment Program
- 170.Managing a Labeling Program
- 171.Managing a PPE Program
- 172.Contractor Prequalification and Oversight
- 173.How to Perform a Field Work Audit
- 174.Walking Through an Incident Investigation
- 175.Human Performance Tools in Depth
- 176.Fatigue, Heat, and Fitness for Duty
- 177.Communication Techniques for Electrical Crews
- 178.Clamp Meters and Current Measurements
- 179.Phase Rotation and Phasing Checks
- 180.Lockout Devices and Hardware Selection
- 181.Course Review: Special Equipment and Emergencies
- 182.Final Reflection: Applying This Course at Your Site
- 183.Self-Assessment: Are You Qualified for This Task?
- 184.Hands-On and Employer-Specific Evaluation Required
Key takeaways
- Deenergize first — ESWC requires all six steps, including absence-of-voltage testing.
- Energized work needs real justification and usually a written permit.
- Only qualified persons may cross the restricted approach boundary.
- The arc flash boundary is 1.2 cal/cm²; never mix PPE selection methods.
- PPE categories: 4, 8, 25, 40 cal/cm²; no meltable fabrics.
- Air-test rubber gloves daily; electrical test every six months.
- Annual CPR/AED and release training; retraining at least every three years.
- This knowledge course does not make anyone qualified — hands-on, employer-specific evaluation on your actual equipment is still required.
- Production pressure is never a justification; use stop-work authority.
Every course includes
Professional narration, synced captions, a knowledge-check quiz, completion records, and certificates of completion for team learners. Works on phone, tablet, and computer.
This is awareness-level training only. It does not certify, qualify, or authorize anyone to perform work and does not by itself establish compliance. The employer is responsible for site-specific training, hands-on verification, and work authorization.