OSHA 29 CFR 1910.147
Lockout/Tagout for Authorized Employees: Lockout Procedures & Equipment
Energy control program requirements, devices, the six-step lockout sequence, verification, release, group lockout, shift changes, contractors, and equipment examples for conveyors, presses, electrical, forklifts, pumps, and valves, plus hidden energy sources, live-dead-live testing, robots, minor servicing, line breaking, lessons from incidents, and California Title 8 section 3314.

What's covered
- 1.Lockout/Tagout for Authorized Employees
- 2.Scope: When Lockout Applies
- 3.Energy-Isolating Devices
- 4.The Energy Control Program
- 5.Written Energy Control Procedures
- 6.Lockout Versus Tagout
- 7.Lock and Tag Device Requirements
- 8.Step 1: Prepare and Notify
- 9.Steps 2 and 3: Shut Down and Isolate
- 10.Step 4: Apply Lockout or Tagout Devices
- 11.Step 5: Control Stored Energy
- 12.Step 6: Verify Isolation
- 13.Releasing Equipment From Lockout
- 14.Testing or Positioning Under Lockout
- 15.Group Lockout
- 16.Shift Changes and Outside Contractors
- 17.When the Lock Owner Is Not Available
- 18.Equipment Group 1: Conveyors and Packaging
- 19.Equipment Group 2: Hydraulic and Pneumatic Presses
- 20.Equipment Group 3: Electrical Panels and Motors
- 21.Equipment Group 4: Forklifts and Mobile Equipment
- 22.Pumps, Steam, and Valves
- 23.Periodic Inspections, Training, and Retraining
- 24.Finding Every Energy Source
- 25.Live-Dead-Live: Testing for Absence of Voltage
- 26.Robots and Automated Cells
- 27.Minor Servicing and Alternative Measures
- 28.Line Breaking: Chemical, Steam, and Thermal Energy
- 29.When Lockout Goes Wrong: Lessons for Authorized Employees
- 30.California Requirements: Title 8 Section 3314
- 31.Recap: Control the Energy Every Time
Key takeaways
- Lockout applies to servicing and to production tasks that bypass guards or put body parts in danger zones.
- Control circuit devices and emergency stops are not energy-isolating devices.
- Follow the six steps: prepare, shut down, isolate, apply devices, control stored energy, verify.
- Use lockout whenever the device can be locked; tagout needs equivalent protection.
- Keep your key; only you remove your lock except under the employer’s documented absent-employee procedure.
- Relieve and block stored energy: pressure, springs, capacitors, gravity, and flywheels.
- Use group lockout so every worker has personal protection, and transfer protection at shift change.
- Coordinate energy control procedures with outside contractors.
- Every machine type has unique energy sources; follow the written equipment-specific procedure.
- Trace every energy source, and prove zero energy with live-dead-live testing on electrical work.
- Lock out robots, automated cells, and process lines at their isolating devices; interlocks and closed valves alone are not enough.
- Classroom training alone does not authorize you; your employer trains and authorizes on specific equipment.
Every course includes
Professional narration, synced captions, a knowledge-check quiz, completion records, and certificates of completion for team learners. Works on phone, tablet, and computer.
This is awareness-level training only. It does not certify, qualify, or authorize anyone to perform work and does not by itself establish compliance. The employer is responsible for site-specific training, hands-on verification, and work authorization.